Conversation records
Append-only records of working sessions: what was asked, what was decided, and what
changed. They are historical evidence, not living documentation — a record is not
rewritten when the project later moves on. Durable outcomes are promoted into the
canonical files designated by ../../PROJECT_RULES.md
(decisions, specifications, architecture, findings); this directory keeps the trail
that produced them.
156 records across 5 dates, newest first.
Index
2026-09-10
2026-09-09
2026-09-02
2026-08-29
2026-08-28
- Versioned semantic matching after the burned cohort
- Execute current priorities and protect
main
- PR #91 negative runtime matrix
- Phase B2 Task 001 evidence and evaluator calibration
- Phase B2 v0.3 legitimate-vs-decoy calibration
- Open-weight benchmark producer experiment
- Continuous GitHub + ChatGPT repository evolution
- Continue ACE and Verified Swarm Runner convergence
- Conjunctive evolution governor convergence
- Executable ACO continuation
- ACE security hardening continuation
- ACE safety and evidence convergence
- Zero-Project-Spend Compute Router
- Whole-System Audit and First Contact Mode
- versioned evaluator semantic matching
- Verification and Orchestration Collaboration
- Top 20 Questions, Scalability, and Agility
- Task Graph, Growth Dynamics, and Self-Evolving Repository
- Target Execution Convergence Follow-up
- Sequential evidence reproducibility hardening
- Science, Physics, Blockchain, and Next Steps
- Run Evidence and Replay Continuation
- route EvaluatorPlan v0.4 through benchmark cohorts
- Repository-Driven Community and Free Agents
- Repository Review and Issue #3 Implementation — 2026-08-28
- Repository Restructure Reassessment
- Repository audit — bugs, convergence, and resource contract boundary
- Repository audit and evidence-retention convergence
- References, Crypto Lessons, and Mandatory GitHub Archiving
- real two-attempt evidence and peer-failure isolation
- real Task 001 v0.4 calibration
- real node runtime falsification and independent verification
- README live-front-door refresh — 2026-08-28
- Random continuation: verification scaling benchmark
- Propagation Check and Owner Admin Action
- ProjectManifest / DomainPack continuation
- Project Turn: Strong Evolution Action and Chat Propagation
- Project Turn: Real two-attempt convergence and benchmark cohort contract
- Project Turn: Real Patch Evaluator Backend
- Project Turn: Phase B2 successor Task 001 first bounded attempt
- Project Turn: Phase B2 evaluator-freeze audit and v2 benchmark commitment
- Project Turn: Freeze the fresh Phase B2 successor five-task cohort
- Project Turn: Execution Targets, Goals, and Tasks
- Project Turn: Continue unified-diff verification and the controlled Docker gate
- Project Turn: Benchmark EvaluatorPlan version routing
- Project Origin Conversation Record — 2026-08-28
- Project Conversation — Patch Evaluator Evidence Completeness
- Project Conversation — Continue Critical Path Toward Real Worker
- Project Conversation — Continue ACE Safety Convergence
- Project Conversation Record — 2026-08-28
- Project continuation — refresh current priorities after evidence convergence
- professional continuation — Resource → Compute Admission
- PR-Lifecycle Resnapshot for Branch Steward
- PR backlog convergence, runtime acceptance, and real multi-attempt continuation
- PR Backlog Convergence and Real-Node Evidence
- Post-merge evolution hardening
- Phase B2 task 001 and evaluator burn
- Phase B2 successor first-five v2 scaffold
- Phase B2 first-five benchmark
- Phase 0 Completion and Next Step
- Mathematical evolution kernel implementation pass
- Mathematical Algorithms and Project Definition
- Maintainer continuation — contracts, observers, and evidence boundaries
- Local Zero-Cost Capability Discovery
- Live repository mathematical portfolio implementation
- Interop branch rescue and A2A v1 conformance correction
- Integrated Self-Evolution Methodology
- independent verification and backpressure
- IDKMesh continuation — independent review evidence validation
- IDKGraph T2 link-integrity convergence
- IDKGraph P1 independent-review follow-up
- Growth Acceleration Audit — 2026-08-28
- Goals and next steps
- GitHub-Constrained Self-Improving Community
- GitHub Pages Public Front Door
- Free Resource Mesh v0
- Free Resource Mesh integration outcome
- Free Agents and Volunteer Computer Nodes
- Framework and Multidisciplinary Collaboration
- Final state: professional PR + branch convergence pass
- Every Activity Should Improve System and Community
- evaluator sovereignty and bound verification control
- Distributed vibe coding, many small models, and open collaboration
- Current-main conjunctive evolution convergence
- Conversation: Phase 0 executable foundation
- Conversation: Field-Defining Questions and First Research Program
- Conversation outcome — real Task 001 v0.4 calibration
- Controlled Docker harness merge outcome
- continue Phase B2 evaluator calibration with v0.4
- Continue ACE Consolidation and Live Capacity
- Continuation: first Phase B2 successor per-task calibration — 2026-08-28
- Continuation: evidence aggregation fabric convergence
- Continuation: benchmark calibration, worker refresh, and convergence — 2026-08-28
- Continuation: anytime-valid sequential evidence
- Continuation: anytime-valid drift guard
- Continuation: adversarial evidence envelope
- Continuation outcome: real multi-attempt convergence and benchmark cohort contract
- Computing Resources and Effortless Routing
- Comprehensive Branch-to-Main Merge Plan
- Complete Next Steps and Project Evolution
- Community-first repository rule
- Collective Intelligence Architecture
- Close the Branch Planner Feedback Loop
- Canonical Node Integration Collaboration
- Branch Steward rate-limit feedback
- Branch Steward Execution Continuation
- Branch convergence and retirement pass
- Branch Convergence and Merge Discipline
- Branch and PR convergence postscript
- Branch and PR convergence continuation
- Autocatalytic Community Evolution
- Algorithmic CI Shadow Planner v0.1
- Algorithm Collaboration Fabric
- ACE Stack Convergence
- ACE Phase-B Activation Gate
- ACE Live-Open-Work Population Continuation
- ACE Live Capacity Recovery
- ACE Lineage-to-Controller Interface
- ACE Lineage Reconciliation
- ACE Hardening Convergence
- ACE cohort observability continuation
- ACE Cohort Denominator and Trust Boundary
- ACE Activation Gate Convergence
- 2026-08-28 — continue: calibrate non-finite free-compute routing
- 2026-08-28 — continue: calibrate branch unobserved-head evidence