Date: 2026-08-28
Repository: MSKazemi/idkmesh
Continue.
The canonical ACE convergence chain had completed on main:
The external Phase-B activation gate remained correctly blocked because public GitHub metadata still reported main as unprotected and Bootstrap Cohort Observatory #109 still reported zero external verified descendants. PR #112 was verified green and moved from draft to ready for independent review; no self-merge was performed.
The Verified Swarm Runner path had also advanced beyond the older issue #16 snapshot:
520ad2c9aa5825476de4957da4702d6823f4edb3, but PR #91 intentionally remains draft for separate human/reviewer inspection.PR #108 contained the first evaluator-side real node -> verifier E2E probe. Its runtime acceptance job passed, but the later E2E job failed before independent verification because the PR merge ref contained an older compatibility wrapper. The failure was explicit:
EvaluatorPlan v0.2 failed schema validation:
backend: 'required_log_types' is a required property;
verifier.adapter_version: '0.1.1' was expected
The latest reviewed PR #108 branch subsequently contained the compatibility fix. Rather than revive the closed acceptance PR or alter the accepted worker, this continuation converges the corrected evaluator-side harness onto current main as a separate integration proposal.
The clean proposal copies the reviewed evaluator harness files from PR #108 and adds a current-main workflow that:
520ad2c9...;The workflow is evidence-only: contents: read, no secrets, no approval/merge/write authority, and no candidate-controlled evaluator code.
worker success != verification
verification evidence != integration authority
healthy ACE capacity != permission to actuate
The next useful milestone is one passing real node -> independent verifier replay, followed by wiring that exact worker/evaluator path behind the already-merged two-attempt orchestrator and run-evidence layer.