Chinese support — risk register and release blockers

Status: Proposed design control
Purpose: Make failure modes explicit before implementation work is advertised, and connect each risk to an owner, detector, mitigation, and release gate.

This register complements ADR-v2-144. It is intentionally broader than ASR accuracy: a Chinese transcript can be correct and the feature can still be unsafe or unusable if configuration, command parsing, injection, packaging, or long-form behavior is wrong.

Status refresh (2026-10-29): This original risk register lists design-time failure modes. Risk R05's whitespace-only Han count defect now has a model-free fix and regression tests in main, but the Mandarin Meeting Mode release gate remains open until actual sessions establish quality thresholds and notes context budgets. See the as-built audit.

Severity scale

Level Meaning
Critical Can execute unintended actions, corrupt user configuration/data, violate privacy/offline guarantees, or make a support claim materially false.
High Can make a primary Chinese workflow fail silently or regress the default English path.
Medium Degrades an important secondary surface or produces confusing/expensive recovery.
Low Localized rough edge with an obvious workaround and no data/safety impact.

Likelihood is estimated only for prioritization and must be updated once evidence exists.

Register

ID Risk Sev. Likelihood before testing Detection / evidence Required mitigation Release status
CHN-R01 High-level language switch writes only part of model/language/script state Critical Medium failure-injection transaction tests preflight all prerequisites; validate candidate; atomic replace; concurrency guard Blocker
CHN-R02 Default English startup/config/latency changes for users who never enable Chinese High Medium English regression suite + import/startup smoke benchmark keep current defaults; lazy optional deps; zero Chinese model load on default path Blocker
CHN-R03 Chinese prose is falsely classified as a command Critical Medium curated negative Mandarin corpus; semantic command vectors anchored deterministic rules; precision-first phrase set; no broad catch-all terminal regex Blocker
CHN-R04 Correct Han text cannot be injected reliably on an OS/backend High High on some backends real X11/Wayland/macOS/Windows injection matrix verified native path or explicit clipboard fallback; never imply untested backend support Blocker for claimed backend
CHN-R05 Mandarin Meeting Mode quality misclassification or unmeasured CJK thresholds High Original Han-whitespace defect fixed in model-free source/tests; real-run likelihood unknown meeting/quality.py::tokenize() now counts Han as quality units; tests/test_meeting_cjk_word_count.py and test_cjk_transcripts.py cover fixed logic, not actual microphone/ASR quality run real healthy/empty/repetition Mandarin meeting corpus, confirm notes context/window and ratio thresholds; exclude Meeting Mode until measured Blocker for unvalidated meeting support claim
CHN-R06 zh-HK accidentally means Mandarin because the Han converter accepts it as a Traditional-script alias High Medium profile alias tests script aliases stay local to script resolver; P1 profile rejects zh-HK with Cantonese explanation Blocker
CHN-R07 Model download or optional dependency installation fails after config has changed High Medium network/package-manager failure tests download/install before commit; --no-download; exact remediation Blocker
CHN-R08 Alternative ASR engine adds a mandatory heavy runtime or breaks packaging High Medium dependency/import/package matrix alternative engines optional + lazy; P1 stays on current runtime unless benchmark justifies change Blocker if alternative becomes recommended
CHN-R09 Model or toolkit license is mistaken for model-weight license Critical Medium explicit license record per artifact legal/license gate before documented support or redistribution; no inference from toolkit license Blocker
CHN-R10 Benchmark overfits a tiny/easy Mandarin set and yields a misleading support claim High High corpus manifest; multiple speech conditions; error subsets predeclare corpora/normalization/thresholds; report raw and normalized CER Blocker
CHN-R11 Script normalization hides recognition errors or performs regional vocabulary changes not requested by user Medium Medium raw-vs-normalized scoring; converter fixtures report both scores; keep character-script conversion separate from regional lexical conversion Blocker for benchmark integrity
CHN-R12 Long-form Whisper decode repeats/hallucinates although short CER looks good High Medium >=30 min Mandarin long-form test; repetition metrics include long-form stability in model gate; preserve/extend quality safeguards Blocker for file/meeting long-form claim
CHN-R13 Chinese command phrasing is literal machine translation rather than natural user speech Medium High Simplified + Traditional native review native reviewer signs off phrase fixtures; keep machine-only suggestions as draft Blocker for command-support claim
CHN-R14 Simplified review is treated as sufficient for Traditional UX/terminology Medium Medium independent Traditional review separate reviewer/checklist and phrase fixtures Blocker for zh-TW claim
CHN-R15 Command-language setting is confused with existing CommandsConfig.profile (editor/app behavior) High Medium config/schema tests dedicated commands.language; never overload application profile Blocker
CHN-R16 Language profile becomes a second persistent truth and drifts from real STT keys High Medium status derivation tests; manual customization test profiles are resolvers/presets only; effective config fields are authoritative Blocker
CHN-R17 Concurrent Settings/CLI writes lose unrelated config changes High Low/Medium stale-plan/concurrent-edit test lock/re-read/re-resolve before atomic commit Blocker
CHN-R18 Alternative engine cannot implement word timestamps/streaming but profile silently selects it Medium Medium SttEngine capability test matrix explicit engine capability metadata; profile cannot select unsupported surface silently Blocker for promoted engine
CHN-R19 Packaging sandbox cannot install OpenCC or write model cache High Medium Snap/macOS/Windows/distro package validation bundle where policy permits or give exact preflight refusal/workaround before config mutation Blocker per package
CHN-R20 Documentation/UI locale silently changes recognition language High Low UI/locale isolation tests localization and speech settings remain independent; only explicit user action changes speech Blocker
CHN-R21 Mandarin-English code-switch expectations creep into P1 and cause false claims Medium High scope review; mixed-language stress results separated keep Polyglot Switch separate; mixed tokens are stress evidence, not a support claim Non-blocking if scope is explicit
CHN-R22 Cantonese is inferred from Traditional output instead of validated separately High Medium profile list and docs review future explicit yue profile/model/eval; P1 says Mandarin Blocker
CHN-R23 Native-speaker validation accidentally commits private voice/audio or identifiers Critical Low/Medium contribution/preflight privacy checks results record observations only; audio stays private unless explicit redistributable consent/license Blocker
CHN-R24 Benchmark result cannot be reproduced because model hash/runtime/hardware is missing High Medium result-schema validation record commit SHA, model artifact/version/hash, dependency versions, hardware, commands, corpus manifest Blocker
CHN-R25 A large contributor task produces a wide agent-generated diff and high review cost Medium High ADR-023 readiness review split implementation into A2/A3 campaign task contracts; L3/architecture stays maintainer-owned Process blocker before advertising task

Risk ownership by workstream

Workstream Primary risks
Profile/config transaction R01, R07, R15, R16, R17, R20
STT/model evaluation R02, R08, R09, R10, R11, R12, R18, R24
Commands R03, R13, R14, R15
Platform/injection R04, R19
File/Meeting Mode R05, R12, R18
Scope/localization R06, R20, R21, R22
Community validation R13, R14, R23, R25

Gate rule

A risk marked Blocker is not waived by a passing aggregate benchmark. It must be either:

  1. mitigated and backed by the named evidence; or
  2. used to narrow the support matrix so the affected surface is explicitly not claimed.

Examples:

  • If Wayland injection remains unverified, Mandarin can still ship for verified platforms, but docs must not present Wayland as fully supported.
  • If Meeting Mode quality metrics remain English-specific, live dictation/file transcription may ship while Chinese Meeting Mode remains experimental or excluded.
  • If small misses the predeclared quality/performance gate, ADR-v2-141 is revisited before release rather than lowering the threshold after seeing results.

Review cadence

Review this table at four points:

  1. ADR acceptance.
  2. Before generating/opening campaign tasks.
  3. Before the first end-to-end Chinese beta.
  4. At the ADR-v2-144 support-release gate.

Any newly discovered failure mode gets an ID before remediation so the test/evidence that closes it remains traceable.